Stitch No. 3


Openwork diamond stitch

Number of stitches: multiple of 8 +1

Horizontally work according to the graphic chart, follow symbols from right to left. Every row begin with symbols before the right vertical green line, then repeat the section of the chart shown between the green lines and end the row with the stitches shown behind the left vertical green line.
Follow the rows vertically from bottom to top, repeating rows 1 to 32.
In the graphic description, only right side rows are shown. In the wrong side rows purl all the stitches included newly make stitches.

Graphic chart:

Symbols in this chart:
– knit 1
– yarn over
– knit 2 together
– slip, slip, knit slipped stitches togeter (video-help)
– centered double decrease: slip 2 together, knit 1, pass the slipped stitches over (together) (video-help)


Comments are closed.